PHOTO A: CONSTRUCTION OF CONDITIONING-HEATING (CENTRAL COLLECTOR)
PHOTO B: TRIPLE USE BOILER HOT WATER ENERGY
PHOTO C: CONSTRUCTION OF AIR-CONDITIONING WITH CENTRAL KLIMATISTIKES UNITS AND WATER COOLERS
PHOTO D: CONSTRUCTION OF AIR-CONDITIONING WITH CENTRAL KLIMATISTIKES UNITS AND WATER COOLERS
PHOTO E: CONSTRUCTION OF AIR-CONDITIONING FOR DISTRIBUTION IN HEATER FAN COILS
PHOTO F: CONSTRUCTION of GAS NETWORK 300MBAR
PHOTO G: CONSTRUCTION CLEANING AND FILTRASIS WATER NETWORK
PHOTO H: CENTRAL GAS EXPLOSIVES DETECTION TABLE
PHOTO J: CONSTRUCTION CLEANING AND FILTRASIS WATER NETWORK
PHOTO K: CONSTRUCTION OF FIRE ALARM NETWORK
PHOTO L: CONSTRUCTION OF CONDITIONING-DUCT INSULATION
PHOTO M: CONSTRUCTION WATERTIGHT CESSPIT
PHOTO N: NATURAL GAS NETWORK CONSTRUCTION 300MBAR