HOTEL ENGINEERS assumes the authorization (EOT) organized tourist camps (CAMPINGS). The authorization has 2 stages. The first stage involves controlling land suitability and approval of architectural plans and the 2nd stage of the procedure for obtaining EOT signal by filing other documents, and the final inspection by an Inspector of the EOT.
HOTEL ENGINEERS, undertakes after autopsy in the area of the future camp, the preparation of technical reports, the design of architectures, the topographical layout, the building permit for small huts to be built, the collection documents the completeness of the dossier submitted in cooperation with the entrepreneur, the procedure for handling of the dossier in EOT PYT and receipt and delivery of authorization (EOT) in tourist accommodation.
Also, we undertake and the License renewal process (EOT) organized tourist camps (CAMPINGS).